Berlin-Köpenick:
Tram line renewal on Mahlsdorfer Straße

Disciplines

  • Railways

Companies

GRE German Rail Engineering GmbH

Construction Sum

approx. € 715 thousand

Client

Berlin public transport company (BVG)

Duration

From 2016 to 2020

Project Activities

Project planning traffic facilities according to § 47 HOAI 2013 Lph 2-5

Technical parameters:

Renewal of the tram tracks

Contact

GRE German Rail Engineering GmbH

Frankfurt (Headquarters)
Frankfurt Airport Center 1
Hugo-Eckener-Ring

D-60549 Frankfurt am Main
Deutschland

Phone: +49 30 24749-0
Fax: +49 30 24749-204
E-Mail: info@gre-rail.com

View in maps

Description

The poor structural condition of the track system and an unsecured crossing point for pedestrians over the tracks require the renewal of the approx. 300 m section of the tram line in Mahlsdorfer Straße between Kaulsdorfer Straße and Hirtestraße. The track spacing varies in the existing section due to the distortions to the crossing and is only around 2.60 metres in places. The standard clearance gauge for the use of modern low-floor trams is therefore not maintained throughout. The new tracks are to be constructed as grass tracks with a track spacing of 3.00 metres. The construction measure offers the possibility of enhancing the streetscape by greening the centre strip in the form of a grass track.